Tender Details
The project involves the clearing of vegetation and earthworks to repair/construct visitor facilities and park infrastructure at Boonoo Boonoo NP damaged during the February 2019 fire. The proposed works involve employing civil contractors to demolish six (6) existing steel footbridges and install concrete culverts to meet current design standards with suitably engineered footings. Detailed engineering specifications and construction documentation have been provided for all bridge locations. Access to all construction sites from Boonoo Boonoo Falls Road using the existing walking tracks and temporary access routes is possible.
Location
Refer to Additional Details / Instructions
RFT Type
Additional Details / Instructions
Please refer to the attached tender documents.