Tender Details
Hydrographic surveyor required to provide survey services for Tweed Sand Bypassing project.
This RFP is for the procurement of a hydrographic surveyor to provide survey services for Tweed Sand Bypassing project. The survey work will involve surveying Tweed River entrance and surrounding Gold Coast beaches. The services must include but are not limited to;
a) Surveying: Conducting routine hydrographic surveying at the Tweed River entrance and other locations specified by the TfNSW stakeholder
b) Reporting: Providing routine hydrographic surveys and other reports as requested
c) Ad hoc services: Conduct ad-hoc surveying as requested.
d) Responsiveness: Be able to take advantage of opportunities to complete the services considering the dynamic coastal environment
Location
Refer to Additional Details / Instructions
RFT Type
This tender opportunity is not expected to lead to the award of a contract, or the award details will be advertised elsewhere. Please telephone or email the contact officer for details
Additional Details / Instructions
In order to gain access to the Request for Tender documents, Tenderers are required to register their interest by sending an email:TSS.Bidder@transport.nsw.gov.au and include the following:
1) Tender No and Title, 2) RFT ID, 3) Organisation Name, 4) ACN/ABN, 5) Contact Name, 6) Organisation/contact postal address, 7) Contact email address (preferably an email address with the contact person's name), 8) Contact phone number To gain access to the tender documents in Ariba over the internet once access is provided, please ensure that you are using PC with web browser:
• Google Chrome 54+ (64 –bit)
• Microsoft Internet Explorer 7-11(32-bit)
• Mozilla Firefox 24 or 27(ESR)
• Safari 9+ (64-bit)
• Microsoft Edge (32-bit)
Location of work is at Tweed River (NSW) and surrounding Gold Coast (Qld) beaches
Covered Procurement Details
- The Procurement (Enforceable Procurement Provisions) Direction 2019 applies to this procurement
- A government agency may conduct negotiations with suppliers regarding the procurement
Conditions for Participation
It will be a requirement for the supplier to have a CPHS Level 1 hydrographic surveyor to oversee all the hydrographic surveying projects and sign off on final records. It is expected that Level 1 will attend key phases of bathymetric survey activity specifically, mobilization and set to work validations/calibrations. In the absence of a CPHS Level 1 hydrographic surveyor, a Level 2 will need to be present.