Tender Details
FORESTRY CORPORATION of NSW (FCNSW) (Principal) intends to engage the services of a suitably experienced and competent Civil Engineering Contractor for the provision of full-service civil works required for a road realignment construction project on Mt Faulk Road in the Olney State Forest, approximately 45 minutes North of Gosford, NSW.
Project works consist of tree clearing, grubbing, topsoil removal, earthworks for road widening, gravelling, associated drainage works, slip face rehabilitation and environmental protection works for Mt Faulk Road. All works are contained within FCNSW management areas. The intention is to have the road closed during the civil works and to open for local traffic only when the Superintendent makes that determination.
Location
RFT Type
Additional Details / Instructions
Refer to GeoTrack’s tender documents including 6 x Design plans and 1 x Tender Document FC2213 - attached
Address for Lodgement
Conditions for Participation
Refer to Geotracks Tender Document FC2213
Estimated Timeframe for Delivery
4 months from the date of possession of site