Tender Details
SYSTEM SPECIFICATIONS AND MINIMUM REQUIREMENTS
The following elements to the wastewater management solution are to be supplied and installed:
- Reconfigured gravity sewer draining amenities block to sewage treatment plant’s flow balance tank (FBT).
- Connect sewer line currently draining to existing sewage treatment plant (STP) to new sewage pump station (SPS).
- SPS to be positioned east of the surf club in the vicinity of the existing buried STP. Control panel for SPS to be located on new plinth adjacent to club’s southern corner (position to be confirmed on-site with NPWS representative).
- Rising main from SPS to new STP.
- New STP located west of the amenities block with integrated FBT.
- A new effluent storage tank (EST) and effluent pump system.
- Effluent transfer mains, filters and automated and manual valves (including backflow prevention) located in suitable surface valve boxes.
- Telemetry and control system for SPS, STP and irrigation system.
- Effluent irrigation fields consisting of covered surface drip (Fields 1 and 2) and sub-surface drip (Fields 3, 4 and 5) irrigation fields.
- Effluent irrigation field flushing mains connected to the SPS / STP as shown.
For further information please refer to the RFQ Documents
Location
RFT Type
Additional Details / Instructions
Pre-tender Meeting
A pre-tender meeting will be held on the date, at the time and at the place nominated in the tender advertisement, and as detailed below:
Wednesday 28th March 2018 at 11:00 am.
Garie Beach Visitors Precinct
Garie Road, Royal National Park NSW 2232
The Contact Person will be available at that time to answer any tenderer’s queries regarding the RFT.
Attendance by tenderers at the pre tender meeting is mandatory. Tenders submitted by tenderers who fail to attend will be passed over.