Tender Details
Council (the Principal) is seeking Quotations from appropriately qualified and experienced Contractors for the renewal of the sewer system for the men’s amenities in the Bradman Oval Change Rooms and the installation of a stormwater overflow system for the Bradman Museum in Bowral. NSW.
The proposed Contract is being offered as two (2) Separable Portions:
• Separable Portion 1 – Bradman Oval Change Room Sewer Renewal
• Separable Portion 2 – Bradman Museum Stormwater Overflow System Installation
Respondents may submit a Quotation for one (1) or both Separable Portions. The Contract may be awarded as one (1) Contract, or as two (2) separate Contracts, at Council’s discretion.
A more detailed brief of the extent of services required by Council is set out in Volume 1 - Specification which is included as part of the Request for Quotation documentation.
In accordance with Council Policy and Guidelines, Council invites quotationsin accordance with this Invitation and the following accompanying documents:
• Volume 1 - Specification
• Volume 1a – Appendices A - B
• Volume 2 - Response Schedules
• Volume 3 - Conditions of Contract, and
• Any published Addenda
Location
RFT Type
Related Web Site Address
Additional Details / Instructions
A Quotation Briefing will be held as per the details provided in the table below:
Date |
Time |
Location |
Thursday, 2 May 2024 |
10.00am |
Bradman Museum, St Jude Street, Bowral NSW 2577 |
Address for Lodgement
Conditions for Participation
Evaluation Criteria
The information required by the Respondent in will be used to evaluate responses in accordance with pre-established Mandatory Participation Criteria, Non-Cost Criteria, and Cost Criteria.
Mandatory Participation Criteria will be assessed on a Yes/No basis and MUST be met by the Respondent. If a response fails to fully comply with any of the outlined Mandatory Criteria, Council may deem the Response to be non-conforming and therefore not be eligible to be shortlisted or progress any further in the evaluation process.
Non-Cost and cost criteria will be evaluated as weighted criteria by the Evaluation Panel for determining an overall value for money evaluation of the Respondent’s submission. Failure to fully comply with Non-Cost and Cost Criteria may reduce the Respondent’s overall score but will not result in the exclusion of the Response from further consideration.
For further information, please see Conditions of Responding – Council Quotations.
Multi Agency Access
Participation Instructions
Amendments
-
3-May-2024 9:58am
Please see downloadable documents
- Addenda 1 - Site Inspection Minutes; and
- Retention Tank Access Ladder Type.