Tender Details
NPWS (National Parks and Wildlife Service) are seeking a suitable contractor for the construction of a new entry road approximately 1.6km in length. The new entry road to the campground off Point Plomer Road would be undertaken through realignment approximately 30m south of its existing position and would require clearing of native vegetation. The new access road would require approximately 0.2ha of site clearing and levelling. Vegetation removal would be limited to the minimum required and larger trees would be preferentially avoided through the design and construction process. The proposed works will be confined with the specifications of the REF and any associated approval. The works will also be with the design parameters attached in RFT Document Pack.
Location
Refer to Additional Details / Instructions
RFT Type
Additional Details / Instructions
Lodged via e-Tendering Website