Grouting of the right abutment spillway (southern upstream corner) is required to seal the seepage from a core drain installed at the base of the spillway side wall; and to extend the grout curtain via fan holes to connect with an existing grout curtain that extends to the south of the spillway. This work require drilling through an existing reinforced concrete gravity wall of variable depth, up to 4.8 metres.
Location
RFT Type
Conditions for Participation
Please be informed that MANDATORY pre tender meeting will be held at State Water Keepit Dam Site Office on Thursday, 9th May 2013 at 1.00pm.