Tender Details
The three main project componentsbriefly described below:
1. Dam Break Modelling - study involving hydraulic modelling (1D/2D) for various flood-induced failure/no failures and static failures utilising the latest flood hydrology for Hume Dam;
2. Inundation Mapping - component involving the generation of spatial inundation parameter results from hydraulic dam break modelling outputs and the preparation of inundation mapping downstream of Hume Dam;
3. Consequence Assessment - component utilising inundation mapping outputs to establish updated consequences of failure for Hume Dam ensuring a spatial link between the between the hydraulic modelling results and the failure consequences; and
The above components are to be undertaken in accordance with current best practice standards and applicable NSW Dams Safety Committee (DSC) and ANCOLD Guidelines.
Location
States and Territories: ACT, NT, QLD, SA, TAS, VIC, WA