Tender Details
The Contract comprises the design and construction of a replacement triple-span pedestrian bridge, with a total length of 50m and a middle span of 30m, over Saltwater Creek, located between the suburbs of Killarney Vale and Long-Jetty. In addition, the works include the demolition of the existing timber bridge prior to constructing the replacement bridge and the design and construction of the bridge approaches.
Council is seeking to use this Request for Tender as a basis for entering into a Contract with the Preferred Tenderer.
Location
Estimated Value
RFT Type
Address for Lodgement
See RFT Documents
Estimated Timeframe for Delivery
Period of time for practical completion is 26 weeks