Tender Details
Tenders are invited for the Tugun tunnel hydraulic design of offline storage tank, pumps and pipes.
The scope of the services is to develop the design through to “Issued for Construction” documentation for the offline storage facilities and associated hydraulic system of the large offline storage tank option as presented in the report in “Tugun Tunnel – Management of Water Quality Risks – Options Report”.
The design must integrate with revised designs for the tunnel sumps and tunnel SCADA control system.
All tenderers must comply with the New South Wales Government's Procurement Policy Framework (NSW Framework), Supplier Code of Conduct (NSW Code) and New South Wales Industrial Relations Guidelines: Building and Construction Procurement (NSW Guidelines).
Copies of the NSW Framework and NSW Code are available at www.buy.nsw.gov.au. The NSW Guidelines are available at www.industrialrelations.nsw.gov.au.
Location
States and Territories: QLD