Tender Details
Buronga 220kV Substation requires refurbishment both internally and externally. Works include but are not limited to replace meal room, replace bathroom facilities, external doors replacement, replace floor finishes, and painting.
The Works cover the supply, fabrication, transport to Site and construction including all civil, structural and environmental works required for Buronga 220kV Substation to this Specification and drawings.
The Works shall be constructed to comply with relevant Australian Standards, the requirements of Australian Regulatory Authorities, the Building Code of Australia, and other relevant Standards and with this Specification and drawings.