TransGrid / Waratah West 330/132 kV Substation Installation of New 330 kV Transformer Civil & Electrical Works - 1282

RFT ID 1282
RFT Type Open Tenders
Published 9-Sep-2009
Closes 13-Oct-2009 11:00am
Category Electrical power transmission engineering
Agency TransGrid


Contact Person
Chris Jones
Phone: 02 9620 0268
chris.b.jones@transgrid.com.au

Tender Details

The Principal is undertaking the installation of a second 330/132 kV 375 MVA transformer at Waratah West 330 kV substation and converting of existing 132 kV line to 330 kV operation to meet future demand. To accommodate the new transformer installation and line conversion, additional switch bays and minor line re-arrangements are required at Waratah West and Newcastle substations.

The Principal will place a single civil and electrical construction contract that covers works for both substations.

Location

NSW Regions: Hunter

RFT Type

Open Tenders - An invitation to tender by public advertisement with no restriction placed on who may tender. Tenderers will normally be required to demonstrate in their tender that they have the necessary skills, resources, experience, financial capacity, and in some cases licences, accreditations, etc., to fulfil the tender requirements.

RFT Preview Document(s)


Additional Details / Instructions

Mandatory Site Inspection

A mandatory site inspection will be conducted as listed below to enable Tenderers to fully familiarise themselves with the site conditions.

Note: It is mandatory that all parties interested in tendering attend this site inspection.

All parties interested in attending the site inspection shall notify their attendance by telephoning Mr. Yousseph Ters on (02) 9620 0388.

 

 

Date

Time

Location

22 September 09

10:30 am

Waratah West 330kV Substation

Wirra Crescent (Off University Drive), Waratah, NSW 2298

22 September 09

Upon completion of first inspection

Newcastle 330kV Substation

Killingworth Road, Killingworth, NSW 2278

All persons attending the site inspection must wear long sleeve shirts, trousers, safety helmets, enclosed footwear and high visibility shirts or vests.  Persons not so attired will not be allowed to enter the switchyard. 

 

Geotechnical Reports

Three (3) Geotechnical Reports are available and are listed in the Part 3 Drawings & Reference Documents Index.  Due to the size of these documents, they will NOT be available for downloading from the TransGrid e-tendering Website.  These documents will be made available (on CD) to representatives of those Companies who have paid for the Specification at the Mandatory Site Meeting.  If these reports are required earlier than this, please contact Mr Chris Jones on 02 9620 0268 or by e-mail to mailto:chris.b.jones@transgrid.com.au